Idaho Data Center Reform
Fiscal Transparency

Fiscal Data Dashboard

Power costs, water quality compliance, and construction/labor data for data center and utility infrastructure across Idaho. Linked to regulatory dockets and energy projects.

Ada

ID
2Meetings0Dockets9Fiscal13DCs

Owyhee

ID
0Meetings0Dockets9Fiscal0DCs

Elmore

ID
4Meetings0Dockets11Fiscal2DCs3Projects
Mountain Home Economic Development Project

Laramie

WY
0Meetings0Dockets13Fiscal1DCs1Projects
Microsoft Cheyenne Data Center Expansion
Featured Infrastructure Project
✓ Deep Research Complete

Mountain Home Economic Development Project

Approximate
Elmore County, IDotherUpdated 10/12/2026

The Mountain Home Air Force Base (MHAFB) Sustainable Water Supply Project is a critical infrastructure initiative designed to secure a long-term, resilient water source for the installation. Historically, the base and the surrounding Elmore County region have relied heavily on the declining Mountain Home Aquifer, which has faced significant depletion. To mitigate this, the project involves the construction of a new water treatment plant and a pump station capable of processing 3.5 million gallons per day of surface water diverted from the Snake River. The project is a collaborative effort involving the U.S. Air Force Civil Engineer Center (AFCEC), the U.S. Army Corps of Engineers (USACE), and the Idaho Department of Water Resources (IDWR). As of mid-2026, the project has reached substantial completion, providing a reliable water supply for the base's population of over 5,200 people and its mission-critical operations. The purpose is to decouple the base's water dependency from the stressed local aquifer, thereby ensuring operational continuity and supporting the broader economic stability of Elmore County, where the base contributes approximately $800 million annually to the local economy.

Key Findings
  • • A 200-275MW AI data center is reportedly under construction in Mountain Home, Idaho.
  • • The facility's power demand is equivalent to approximately 2,500 residential homes.
  • • Idaho's water stress is rated as Medium-High, raising concerns about data center cooling needs.
  • • Downtown revitalization in Mountain Home is projected to add 26.8 jobs and $1.7M in annual output.
  • • Proposals exist for utilizing Idaho public lands for massive data center projects.
  • • The Shoshone-Bannock Tribes have been involved in assessing the resort and economic development market in the area.
  • • Idaho's energy grid currently relies on a 55.1% renewable mix with 632 lb/MWh CO2 emissions.
Featured Infrastructure Project
✓ Deep Research Complete

South Fork Boise River Diversion Project

Parcel-Verified
Elmore County, IDwater diversionUpdated 10/12/2026

The South Fork Boise River (SFBR) Diversion Project is an infrastructure initiative spearheaded by Elmore County, Idaho, designed to address critical water shortages in the Mountain Home area. The project aims to divert up to 200 cubic feet per second (cfs) of water from the Anderson Ranch Reservoir during flood flow operations. This water would be transported to the Little Camas Reservoir and subsequently directed through existing canal systems to designated aquifer recharge facilities. The primary purpose is to replenish the rapidly depleting aquifer that supports local agriculture and the Mountain Home Air Force Base. The project is currently in the planning and permitting phase, with Elmore County acting as the primary owner and operator. It involves the construction of a new pump station at Anderson Ranch Reservoir and the utilization of existing canal infrastructure. While distinct from the state-led Anderson Ranch Dam raise project, the two are often discussed in the context of regional water reliability.

Key Findings
  • • Elmore County holds an approved permit to divert 200 cfs of floodwater from the South Fork Boise River.
  • • The project aims to recharge the rapidly depleting Mountain Home aquifer to prevent water right curtailments.
  • • Water would be pumped from Anderson Ranch Reservoir to Little Camas Reservoir.
  • • The estimated average annual diversion is 7,500 acre-feet, available approximately every other year.
  • • The project faces opposition from the Idaho Conservation League.
  • • Estimated water costs are significantly higher than current irrigation costs, ranging from $90 to over $200 per acre-foot.
  • • The project is currently in the preliminary design and engineering phase for the pump station and pipeline.
Featured Infrastructure Project
✓ Deep Research Complete

Microsoft Cheyenne Data Center Expansion

Approximate
Laramie County, WYotherUpdated 10/12/2026

The Microsoft Cheyenne Data Center expansion is a large-scale cloud and AI infrastructure project located in Laramie County, Wyoming. Microsoft has operated data centers in Cheyenne since 2012, with the current expansion involving the proposed acquisition of approximately 3,200 acres of land to scale capacity for growing cloud and AI workloads. The project is managed by Microsoft’s Cloud Operations + Innovation division. The infrastructure includes high-density server facilities, advanced cooling systems, and significant off-site utility improvements, such as new pump stations and municipal water infrastructure. The project is currently in the planning and public engagement phase, with Microsoft submitting applications for expansion sites, including a 385-acre site east of College. The purpose of the expansion is to meet the surging demand for digital services, cloud computing, and AI, while positioning Cheyenne as a key hub in Microsoft’s global infrastructure network.

Key Findings
  • • Microsoft is expanding its data center operations in Cheyenne, Wyoming, including a 3,460-acre annexation approved by the City Council.
  • • The expansion is expected to create thousands of construction jobs and long-term tech jobs.
  • • Microsoft plans to use direct evaporative cooling and claims it will replenish more water than it uses.
  • • Residents have raised significant concerns about water use, environmental degradation, and noise/light pollution.
  • • The Cheyenne City Council voted 9-1 against a moratorium on new data center development.
  • • Microsoft has donated $4.7 million to local organizations since 2018.
  • • A recent incident involving another data center developer contaminating the sewer system has heightened environmental concerns.
200
Total Records
64
Power Cost
71
Water Quality
65
Construction
State
200 records
Power CostEstimate
WA › Okanogan
Reporting: 2026-07-01 → 2026-09-30
$0.09/kWh
Grant County PUD
—
Water Status
—
Construction
Construction & LaborEstimate
WA › Okanogan
Reporting: 2026-07-01 → 2026-09-30
—
Power Rate
—
Water Status
$6566K
Okanogan County Infrastructure
Water QualityEstimate
WA › Okanogan
Reporting: 2026-07-01 → 2026-09-30
Compliant
—
Power Rate
Compliant
1310 AF/yr
—
Construction
Water QualityEstimate
ID › Owyhee
Reporting: 2026-07-01 → 2026-09-30
Compliant
—
Power Rate
Compliant
697 AF/yr
—
Construction
Water QualityEstimate
OR › Polk
Reporting: 2026-07-01 → 2026-09-30
Compliant
—
Power Rate
Compliant
730 AF/yr
—
Construction
Construction & LaborEstimate
OR › Lincoln
Reporting: 2026-07-01 → 2026-09-30
—
Power Rate
—
Water Status
$5035K
Lincoln County Infrastructure
Power CostEstimate
ID › Owyhee
Reporting: 2026-07-01 → 2026-09-30
$0.11/kWh
Idaho Power
—
Water Status
—
Construction
Water QualityEstimate
WA › Franklin
Reporting: 2026-07-01 → 2026-09-30
Compliant
—
Power Rate
Compliant
856 AF/yr
—
Construction
Construction & LaborEstimate
ID › Gooding
Reporting: 2026-07-01 → 2026-09-30
—
Power Rate
—
Water Status
$3630K
Gooding County Infrastructure
Power CostEstimate
ID › Franklin
Reporting: 2026-07-01 → 2026-09-30
$0.11/kWh
Idaho Power
—
Water Status
—
Construction
Water QualityEstimate
WA › Lewis
Reporting: 2026-07-01 → 2026-09-30
Compliant
—
Power Rate
Compliant
987 AF/yr
—
Construction
Water QualityEstimate
OR › Lincoln
Reporting: 2026-07-01 → 2026-09-30
Compliant
—
Power Rate
Compliant
648 AF/yr
—
Construction
Power CostEstimate
ID › Cassia
Reporting: 2026-07-01 → 2026-09-30
$0.11/kWh
Idaho Power
—
Water Status
—
Construction
Water QualityEstimate
OR › Benton
Reporting: 2026-07-01 → 2026-09-30
Compliant
—
Power Rate
Compliant
633 AF/yr
—
Construction
Construction & LaborEstimate
OR › Polk
Reporting: 2026-07-01 → 2026-09-30
—
Power Rate
—
Water Status
$3725K
Polk County Infrastructure
Power CostEstimate
OR › Lincoln
Reporting: 2026-07-01 → 2026-09-30
$0.12/kWh
Portland General Electric
—
Water Status
—
Construction
Water QualityEstimate
WA › Cowlitz
Reporting: 2026-07-01 → 2026-09-30
Compliant
—
Power Rate
Compliant
1277 AF/yr
—
Construction
Construction & LaborEstimate
WA › Franklin
Reporting: 2026-07-01 → 2026-09-30
—
Power Rate
—
Water Status
$6538K
Franklin County Infrastructure
Water QualityEstimate
OR › Josephine
Reporting: 2026-07-01 → 2026-09-30
Compliant
—
Power Rate
Compliant
459 AF/yr
—
Construction
Water QualityEstimate
ID › Jerome
Reporting: 2026-07-01 → 2026-09-30
Compliant
—
Power Rate
Compliant
1024 AF/yr
—
Construction
Power CostEstimate
OR › Polk
Reporting: 2026-07-01 → 2026-09-30
$0.12/kWh
Portland General Electric
—
Water Status
—
Construction
Construction & LaborEstimate
OR › Coos
Reporting: 2026-07-01 → 2026-09-30
—
Power Rate
—
Water Status
$5525K
Coos County Infrastructure
Construction & LaborEstimate
WA › Lewis
Reporting: 2026-07-01 → 2026-09-30
—
Power Rate
—
Water Status
$6848K
Lewis County Infrastructure
Construction & LaborEstimate
OR › Benton
Reporting: 2026-07-01 → 2026-09-30
—
Power Rate
—
Water Status
$3540K
Benton County Infrastructure
Power CostEstimate
OR › Josephine
Reporting: 2026-07-01 → 2026-09-30
$0.12/kWh
Portland General Electric
—
Water Status
—
Construction
Power CostEstimate
WA › Lewis
Reporting: 2026-07-01 → 2026-09-30
$0.09/kWh
Grant County PUD
—
Water Status
—
Construction
Construction & LaborEstimate
WA › Whitman
Reporting: 2026-07-01 → 2026-09-30
—
Power Rate
—
Water Status
$5933K
Whitman County Infrastructure
Water QualityEstimate
ID › Franklin
Reporting: 2026-07-01 → 2026-09-30
Compliant
—
Power Rate
Compliant
610 AF/yr
—
Construction
Construction & LaborEstimate
ID › Franklin
Reporting: 2026-07-01 → 2026-09-30
—
Power Rate
—
Water Status
$5190K
Franklin County Infrastructure
Power CostEstimate
OR › Coos
Reporting: 2026-07-01 → 2026-09-30
$0.12/kWh
Portland General Electric
—
Water Status
—
Construction
Power CostEstimate
WA › Cowlitz
Reporting: 2026-07-01 → 2026-09-30
$0.09/kWh
Grant County PUD
—
Water Status
—
Construction
Construction & LaborEstimate
ID › Owyhee
Reporting: 2026-07-01 → 2026-09-30
—
Power Rate
—
Water Status
$3021K
Owyhee County Infrastructure
Power CostEstimate
OR › Benton
Reporting: 2026-07-01 → 2026-09-30
$0.12/kWh
Portland General Electric
—
Water Status
—
Construction
Water QualityEstimate
OR › Coos
Reporting: 2026-07-01 → 2026-09-30
Compliant
—
Power Rate
Compliant
639 AF/yr
—
Construction
Power CostEstimate
WA › Franklin
Reporting: 2026-07-01 → 2026-09-30
$0.09/kWh
Grant County PUD
—
Water Status
—
Construction
Power CostEstimate
ID › Gooding
Reporting: 2026-07-01 → 2026-09-30
$0.11/kWh
Idaho Power
—
Water Status
—
Construction
Water QualityEstimate
ID › Gooding
Reporting: 2026-07-01 → 2026-09-30
Compliant
—
Power Rate
Compliant
683 AF/yr
—
Construction
Water QualityEstimate
ID › Cassia
Reporting: 2026-07-01 → 2026-09-30
Compliant
—
Power Rate
Compliant
677 AF/yr
—
Construction
Construction & LaborEstimate
OR › Josephine
Reporting: 2026-07-01 → 2026-09-30
—
Power Rate
—
Water Status
$4671K
Josephine County Infrastructure
Power CostEstimate
ID › Jerome
Reporting: 2026-07-01 → 2026-09-30
$0.11/kWh
Idaho Power
—
Water Status
—
Construction
Construction & LaborEstimate
ID › Jerome
Reporting: 2026-07-01 → 2026-09-30
—
Power Rate
—
Water Status
$5230K
Jerome County Infrastructure
Construction & LaborEstimate
ID › Cassia
Reporting: 2026-07-01 → 2026-09-30
—
Power Rate
—
Water Status
$4106K
Cassia County Infrastructure
Water QualityEstimate
WA › Whitman
Reporting: 2026-07-01 → 2026-09-30
Compliant
—
Power Rate
Compliant
1319 AF/yr
—
Construction
Construction & LaborEstimate
WA › Cowlitz
Reporting: 2026-07-01 → 2026-09-30
—
Power Rate
—
Water Status
$6480K
Cowlitz County Infrastructure
Power CostEstimate
WA › Whitman
Reporting: 2026-07-01 → 2026-09-30
$0.09/kWh
Grant County PUD
—
Water Status
—
Construction
Water QualityAPI
WY
Reporting: 2026-07-01 → 2026-09-30
Unknown
—
Power Rate
Unknown
Water Status
—
Construction
Water QualityAPI
MT
Reporting: 2026-07-01 → 2026-09-30
Unknown
—
Power Rate
Unknown
Water Status
—
Construction
Water QualityAPI
NV
Reporting: 2026-07-01 → 2026-09-30
Unknown
—
Power Rate
Unknown
Water Status
—
Construction
Water QualityAPI
WA
Reporting: 2026-07-01 → 2026-09-30
Unknown
—
Power Rate
Unknown
Water Status
—
Construction
Water QualityAPI
OR
Reporting: 2026-07-01 → 2026-09-30
Unknown
—
Power Rate
Unknown
Water Status
—
Construction
Water QualityAPI
ID
Reporting: 2026-07-01 → 2026-09-30
Unknown
—
Power Rate
Unknown
Water Status
—
Construction
Water QualityEstimate
MT › Park
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
845 AF/yr
—
Construction
Construction & LaborEstimate
MT › Park
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$3460K
Park County Infrastructure
Power CostEstimate
MT › Broadwater
Reporting: 2026-06-01 → 2026-08-31
$0.11/kWh
NorthWestern Energy
—
Water Status
—
Construction
Water QualityEstimate
MT › Broadwater
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
593 AF/yr
—
Construction
Construction & LaborEstimate
MT › Broadwater
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$4032K
Broadwater County Infrastructure
Power CostEstimate
MT › Deer Lodge
Reporting: 2026-06-01 → 2026-08-31
$0.11/kWh
NorthWestern Energy
—
Water Status
—
Construction
Water QualityEstimate
MT › Deer Lodge
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
489 AF/yr
—
Construction
Construction & LaborEstimate
MT › Deer Lodge
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$3982K
Deer Lodge County Infrastructure
Power CostEstimate
MT › Glacier
Reporting: 2026-06-01 → 2026-08-31
$0.11/kWh
NorthWestern Energy
—
Water Status
—
Construction
Water QualityEstimate
MT › Glacier
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
798 AF/yr
—
Construction
Construction & LaborEstimate
MT › Glacier
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$4573K
Glacier County Infrastructure
Power CostEstimate
MT › Hill
Reporting: 2026-06-01 → 2026-08-31
$0.11/kWh
NorthWestern Energy
—
Water Status
—
Construction
Water QualityEstimate
MT › Hill
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
796 AF/yr
—
Construction
Construction & LaborEstimate
MT › Hill
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$3908K
Hill County Infrastructure
Power CostEstimate
MT › Carbon
Reporting: 2026-06-01 → 2026-08-31
$0.11/kWh
NorthWestern Energy
—
Water Status
—
Construction
Water QualityEstimate
MT › Carbon
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
657 AF/yr
—
Construction
Construction & LaborEstimate
MT › Carbon
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$5306K
Carbon County Infrastructure
Power CostEstimate
MT › Fergus
Reporting: 2026-06-01 → 2026-08-31
$0.11/kWh
NorthWestern Energy
—
Water Status
—
Construction
Water QualityEstimate
MT › Fergus
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
857 AF/yr
—
Construction
Construction & LaborEstimate
MT › Fergus
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$4001K
Fergus County Infrastructure
Power CostEstimate
WY › Laramie
Reporting: 2026-06-01 → 2026-08-31
$0.10/kWh
Rocky Mountain Power
—
Water Status
—
Construction
Water QualityEstimate
WY › Laramie
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
510 AF/yr
—
Construction
Construction & LaborEstimate
WY › Laramie
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$4012K
Laramie County Infrastructure
Power CostEstimate
WY › Natrona
Reporting: 2026-06-01 → 2026-08-31
$0.10/kWh
Rocky Mountain Power
—
Water Status
—
Construction
Water QualityEstimate
WY › Natrona
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
338 AF/yr
—
Construction
Construction & LaborEstimate
WY › Natrona
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$3557K
Natrona County Infrastructure
Power CostEstimate
WY › Fremont
Reporting: 2026-06-01 → 2026-08-31
$0.10/kWh
Rocky Mountain Power
—
Water Status
—
Construction
Water QualityEstimate
WY › Fremont
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
358 AF/yr
—
Construction
Construction & LaborEstimate
WY › Fremont
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$4989K
Fremont County Infrastructure
Power CostEstimate
WY › Sweetwater
Reporting: 2026-06-01 → 2026-08-31
$0.10/kWh
Rocky Mountain Power
—
Water Status
—
Construction
Water QualityEstimate
WY › Sweetwater
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
495 AF/yr
—
Construction
Construction & LaborEstimate
WY › Sweetwater
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$5142K
Sweetwater County Infrastructure
Power CostEstimate
WY › Albany
Reporting: 2026-06-01 → 2026-08-31
$0.10/kWh
Rocky Mountain Power
—
Water Status
—
Construction
Water QualityEstimate
WY › Albany
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
389 AF/yr
—
Construction
Construction & LaborEstimate
WY › Albany
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$3209K
Albany County Infrastructure
Power CostEstimate
WY › Campbell
Reporting: 2026-06-01 → 2026-08-31
$0.10/kWh
Rocky Mountain Power
—
Water Status
—
Construction
Water QualityEstimate
WY › Campbell
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
540 AF/yr
—
Construction
Construction & LaborEstimate
WY › Campbell
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$5211K
Campbell County Infrastructure
Power CostEstimate
WY › Sheridan
Reporting: 2026-06-01 → 2026-08-31
$0.10/kWh
Rocky Mountain Power
—
Water Status
—
Construction
Water QualityEstimate
WY › Sheridan
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
541 AF/yr
—
Construction
Construction & LaborEstimate
WY › Sheridan
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$5374K
Sheridan County Infrastructure
Power CostEstimate
WY › Teton
Reporting: 2026-06-01 → 2026-08-31
$0.10/kWh
Rocky Mountain Power
—
Water Status
—
Construction
Water QualityEstimate
WY › Teton
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
372 AF/yr
—
Construction
Construction & LaborEstimate
WY › Teton
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$3559K
Teton County Infrastructure
Power CostEstimate
WY › Park
Reporting: 2026-06-01 → 2026-08-31
$0.10/kWh
Rocky Mountain Power
—
Water Status
—
Construction
Water QualityEstimate
WY › Park
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
314 AF/yr
—
Construction
Construction & LaborEstimate
WY › Park
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$3791K
Park County Infrastructure
Power CostEstimate
WY › Lincoln
Reporting: 2026-06-01 → 2026-08-31
$0.10/kWh
Rocky Mountain Power
—
Water Status
—
Construction
Water QualityEstimate
WY › Lincoln
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
436 AF/yr
—
Construction
Construction & LaborEstimate
WY › Lincoln
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$4654K
Lincoln County Infrastructure
Power CostEstimate
WY › Uinta
Reporting: 2026-06-01 → 2026-08-31
$0.10/kWh
Rocky Mountain Power
—
Water Status
—
Construction
Water QualityEstimate
WY › Uinta
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
424 AF/yr
—
Construction
Construction & LaborEstimate
WY › Uinta
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$3496K
Uinta County Infrastructure
Power CostEstimate
WY › Carbon
Reporting: 2026-06-01 → 2026-08-31
$0.10/kWh
Rocky Mountain Power
—
Water Status
—
Construction
Water QualityEstimate
WY › Carbon
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
387 AF/yr
—
Construction
Construction & LaborEstimate
WY › Carbon
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$4146K
Carbon County Infrastructure
Power CostEstimate
WY › Converse
Reporting: 2026-06-01 → 2026-08-31
$0.10/kWh
Rocky Mountain Power
—
Water Status
—
Construction
Water QualityEstimate
WY › Converse
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
520 AF/yr
—
Construction
Construction & LaborEstimate
WY › Converse
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$3260K
Converse County Infrastructure
Power CostEstimate
WY › Goshen
Reporting: 2026-06-01 → 2026-08-31
$0.10/kWh
Rocky Mountain Power
—
Water Status
—
Construction
Water QualityEstimate
WY › Goshen
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
387 AF/yr
—
Construction
Construction & LaborEstimate
WY › Goshen
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$4525K
Goshen County Infrastructure
Power CostEstimate
WY › Sublette
Reporting: 2026-06-01 → 2026-08-31
$0.10/kWh
Rocky Mountain Power
—
Water Status
—
Construction
Water QualityEstimate
WY › Sublette
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
561 AF/yr
—
Construction
Construction & LaborEstimate
WY › Sublette
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$5618K
Sublette County Infrastructure
Water QualityEstimate
WA › Cowlitz
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
1191 AF/yr
—
Construction
Construction & LaborEstimate
WA › Cowlitz
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$5680K
Cowlitz County Infrastructure
Power CostEstimate
WA › Lewis
Reporting: 2026-06-01 → 2026-08-31
$0.09/kWh
Grant County PUD
—
Water Status
—
Construction
Water QualityEstimate
WA › Lewis
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
965 AF/yr
—
Construction
Construction & LaborEstimate
WA › Lewis
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$6606K
Lewis County Infrastructure
Power CostEstimate
WA › Franklin
Reporting: 2026-06-01 → 2026-08-31
$0.09/kWh
Grant County PUD
—
Water Status
—
Construction
Water QualityEstimate
WA › Franklin
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
774 AF/yr
—
Construction
Construction & LaborEstimate
WA › Franklin
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$5216K
Franklin County Infrastructure
Power CostEstimate
WA › Whitman
Reporting: 2026-06-01 → 2026-08-31
$0.09/kWh
Grant County PUD
—
Water Status
—
Construction
Water QualityEstimate
WA › Whitman
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
1347 AF/yr
—
Construction
Construction & LaborEstimate
WA › Whitman
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$4793K
Whitman County Infrastructure
Power CostEstimate
WA › Okanogan
Reporting: 2026-06-01 → 2026-08-31
$0.09/kWh
Grant County PUD
—
Water Status
—
Construction
Water QualityEstimate
WA › Okanogan
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
1226 AF/yr
—
Construction
Construction & LaborEstimate
WA › Okanogan
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$4358K
Okanogan County Infrastructure
Power CostEstimate
NV › Clark
Reporting: 2026-06-01 → 2026-08-31
$0.13/kWh
NV Energy
—
Water Status
—
Construction
Water QualityEstimate
NV › Clark
Reporting: 2026-06-01 → 2026-08-31
Under Review
—
Power Rate
Under Review
364 AF/yr
—
Construction
Construction & LaborEstimate
NV › Clark
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$7655K
Clark County Infrastructure
Power CostEstimate
NV › Washoe
Reporting: 2026-06-01 → 2026-08-31
$0.13/kWh
NV Energy
—
Water Status
—
Construction
Water QualityEstimate
NV › Washoe
Reporting: 2026-06-01 → 2026-08-31
Under Review
—
Power Rate
Under Review
210 AF/yr
—
Construction
Construction & LaborEstimate
NV › Washoe
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$7974K
Washoe County Infrastructure
Power CostEstimate
NV › Carson City
Reporting: 2026-06-01 → 2026-08-31
$0.13/kWh
NV Energy
—
Water Status
—
Construction
Water QualityEstimate
NV › Carson City
Reporting: 2026-06-01 → 2026-08-31
Under Review
—
Power Rate
Under Review
211 AF/yr
—
Construction
Construction & LaborEstimate
NV › Carson City
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$8490K
Carson City County Infrastructure
Power CostEstimate
NV › Douglas
Reporting: 2026-06-01 → 2026-08-31
$0.13/kWh
NV Energy
—
Water Status
—
Construction
Water QualityEstimate
NV › Douglas
Reporting: 2026-06-01 → 2026-08-31
Under Review
—
Power Rate
Under Review
307 AF/yr
—
Construction
Construction & LaborEstimate
NV › Douglas
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$5613K
Douglas County Infrastructure
Power CostEstimate
NV › Lyon
Reporting: 2026-06-01 → 2026-08-31
$0.13/kWh
NV Energy
—
Water Status
—
Construction
Water QualityEstimate
NV › Lyon
Reporting: 2026-06-01 → 2026-08-31
Under Review
—
Power Rate
Under Review
311 AF/yr
—
Construction
Construction & LaborEstimate
NV › Lyon
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$8035K
Lyon County Infrastructure
Power CostEstimate
NV › Elko
Reporting: 2026-06-01 → 2026-08-31
$0.13/kWh
NV Energy
—
Water Status
—
Construction
Water QualityEstimate
NV › Elko
Reporting: 2026-06-01 → 2026-08-31
Under Review
—
Power Rate
Under Review
372 AF/yr
—
Construction
Construction & LaborEstimate
NV › Elko
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$6873K
Elko County Infrastructure
Power CostEstimate
NV › Humboldt
Reporting: 2026-06-01 → 2026-08-31
$0.13/kWh
NV Energy
—
Water Status
—
Construction
Water QualityEstimate
NV › Humboldt
Reporting: 2026-06-01 → 2026-08-31
Under Review
—
Power Rate
Under Review
278 AF/yr
—
Construction
Construction & LaborEstimate
NV › Humboldt
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$6341K
Humboldt County Infrastructure
Power CostEstimate
NV › Nye
Reporting: 2026-06-01 → 2026-08-31
$0.13/kWh
NV Energy
—
Water Status
—
Construction
Water QualityEstimate
NV › Nye
Reporting: 2026-06-01 → 2026-08-31
Under Review
—
Power Rate
Under Review
392 AF/yr
—
Construction
Construction & LaborEstimate
NV › Nye
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$8325K
Nye County Infrastructure
Power CostEstimate
NV › Storey
Reporting: 2026-06-01 → 2026-08-31
$0.13/kWh
NV Energy
—
Water Status
—
Construction
Water QualityEstimate
NV › Storey
Reporting: 2026-06-01 → 2026-08-31
Under Review
—
Power Rate
Under Review
374 AF/yr
—
Construction
Construction & LaborEstimate
NV › Storey
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$5810K
Storey County Infrastructure
Power CostEstimate
NV › Churchill
Reporting: 2026-06-01 → 2026-08-31
$0.13/kWh
NV Energy
—
Water Status
—
Construction
Water QualityEstimate
NV › Churchill
Reporting: 2026-06-01 → 2026-08-31
Under Review
—
Power Rate
Under Review
292 AF/yr
—
Construction
Construction & LaborEstimate
NV › Churchill
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$6878K
Churchill County Infrastructure
Power CostEstimate
NV › White Pine
Reporting: 2026-06-01 → 2026-08-31
$0.13/kWh
NV Energy
—
Water Status
—
Construction
Water QualityEstimate
NV › White Pine
Reporting: 2026-06-01 → 2026-08-31
Under Review
—
Power Rate
Under Review
280 AF/yr
—
Construction
Construction & LaborEstimate
NV › White Pine
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$9153K
White Pine County Infrastructure
Power CostEstimate
NV › Lander
Reporting: 2026-06-01 → 2026-08-31
$0.13/kWh
NV Energy
—
Water Status
—
Construction
Water QualityEstimate
NV › Lander
Reporting: 2026-06-01 → 2026-08-31
Under Review
—
Power Rate
Under Review
250 AF/yr
—
Construction
Construction & LaborEstimate
NV › Lander
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$8287K
Lander County Infrastructure
Power CostEstimate
NV › Pershing
Reporting: 2026-06-01 → 2026-08-31
$0.13/kWh
NV Energy
—
Water Status
—
Construction
Water QualityEstimate
NV › Pershing
Reporting: 2026-06-01 → 2026-08-31
Under Review
—
Power Rate
Under Review
304 AF/yr
—
Construction
Construction & LaborEstimate
NV › Pershing
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$5352K
Pershing County Infrastructure
Power CostEstimate
NV › Mineral
Reporting: 2026-06-01 → 2026-08-31
$0.13/kWh
NV Energy
—
Water Status
—
Construction
Water QualityEstimate
NV › Mineral
Reporting: 2026-06-01 → 2026-08-31
Under Review
—
Power Rate
Under Review
348 AF/yr
—
Construction
Construction & LaborEstimate
NV › Mineral
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$7076K
Mineral County Infrastructure
Power CostEstimate
NV › Eureka
Reporting: 2026-06-01 → 2026-08-31
$0.13/kWh
NV Energy
—
Water Status
—
Construction
Water QualityEstimate
NV › Eureka
Reporting: 2026-06-01 → 2026-08-31
Under Review
—
Power Rate
Under Review
235 AF/yr
—
Construction
Construction & LaborEstimate
NV › Eureka
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$7904K
Eureka County Infrastructure
Power CostEstimate
MT › Yellowstone
Reporting: 2026-06-01 → 2026-08-31
$0.11/kWh
NorthWestern Energy
—
Water Status
—
Construction
Water QualityEstimate
MT › Yellowstone
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
468 AF/yr
—
Construction
Construction & LaborEstimate
MT › Yellowstone
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$3697K
Yellowstone County Infrastructure
Power CostEstimate
MT › Missoula
Reporting: 2026-06-01 → 2026-08-31
$0.11/kWh
NorthWestern Energy
—
Water Status
—
Construction
Water QualityEstimate
MT › Missoula
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
727 AF/yr
—
Construction
Construction & LaborEstimate
MT › Missoula
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$4404K
Missoula County Infrastructure
Power CostEstimate
MT › Gallatin
Reporting: 2026-06-01 → 2026-08-31
$0.11/kWh
NorthWestern Energy
—
Water Status
—
Construction
Water QualityEstimate
MT › Gallatin
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
597 AF/yr
—
Construction
Construction & LaborEstimate
MT › Gallatin
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$5652K
Gallatin County Infrastructure
Power CostEstimate
MT › Cascade
Reporting: 2026-06-01 → 2026-08-31
$0.11/kWh
NorthWestern Energy
—
Water Status
—
Construction
Water QualityEstimate
MT › Cascade
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
660 AF/yr
—
Construction
Construction & LaborEstimate
MT › Cascade
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$4455K
Cascade County Infrastructure
Power CostEstimate
MT › Lewis and Clark
Reporting: 2026-06-01 → 2026-08-31
$0.11/kWh
NorthWestern Energy
—
Water Status
—
Construction
Water QualityEstimate
MT › Lewis and Clark
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
520 AF/yr
—
Construction
Construction & LaborEstimate
MT › Lewis and Clark
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$3860K
Lewis and Clark County Infrastructure
Power CostEstimate
MT › Flathead
Reporting: 2026-06-01 → 2026-08-31
$0.11/kWh
NorthWestern Energy
—
Water Status
—
Construction
Water QualityEstimate
MT › Flathead
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
680 AF/yr
—
Construction
Construction & LaborEstimate
MT › Flathead
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$4740K
Flathead County Infrastructure
Power CostEstimate
MT › Silver Bow
Reporting: 2026-06-01 → 2026-08-31
$0.11/kWh
NorthWestern Energy
—
Water Status
—
Construction
Water QualityEstimate
MT › Silver Bow
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
685 AF/yr
—
Construction
Construction & LaborEstimate
MT › Silver Bow
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$3601K
Silver Bow County Infrastructure
Power CostEstimate
MT › Ravalli
Reporting: 2026-06-01 → 2026-08-31
$0.11/kWh
NorthWestern Energy
—
Water Status
—
Construction
Water QualityEstimate
MT › Ravalli
Reporting: 2026-06-01 → 2026-08-31
Compliant
—
Power Rate
Compliant
521 AF/yr
—
Construction
Construction & LaborEstimate
MT › Ravalli
Reporting: 2026-06-01 → 2026-08-31
—
Power Rate
—
Water Status
$5056K
Ravalli County Infrastructure
Power CostEstimate
MT › Park
Reporting: 2026-06-01 → 2026-08-31
$0.11/kWh
NorthWestern Energy
—
Water Status
—
Construction

Comment Period Alerts

Get notified by email when public comment periods open or are about to close in your county.

Select Counties